ENVIRONMENTAL DESIGN AND AUDIT
“TWO K” LLP has the extensive experience in development and approval of project documentation in the field of ecology in accordance with the current legislation of the Republic of Kazakhstan since theyear2007.
The actual services and project documents in the field of environmental protection provided by our company for Subsoil users currently include:
- Proposed Activity Statement (ZOND)
- Environmental impact assessment (environmental protection EP)
- Making of a report on possible impacts
- Post-project analysis of the actual impacts of the proposed activity implementation
- Draft Permissible Emission Standards (NDV)
- Draft norms for permissible discharges (PDN)
- Draft Regulations for Waste Disposal (PRD)
- Waste Management Program (WMP)
- Draft standards for sulfur placement in open form on sulfur pads (while operations for hydrocarbons exploration and production)
- Development of a project for Industrial Environmental Control (IEC)
- Development of a draft environmental protection action plan (EPP)
- Inventory of emission sources
- Hazardous Waste Passports
- Permit for emissions
- Holding public hearings anywhere in Kazakhstan
- Mining Response Project/Plan
- Return of the contract area or parts thereof
- Inspection of the territory returned to the state, drawing up of lands survey act in presence of a commission